Step-by-Step Lesson • Step 1 of 6
ARCH-M1-11: Mean Deviation Balancing, Grouped Median Interpolation & Unequal-Width Histograms
Step 1 of 6 • The Core Idea
ARCH-M1-11: Why the 135s Classroom Method Fails Under the 90s Clock
Standard Classroom Method (Too Slow)~135s (Blows 90s Clock)
Original total mass . New mean , so new total mass . The new rowers have combined mass , giving a mean of (~115s).
The Fast ShortcutTarget: 40s (Saves 95s)
Line 1 (Deviation Balance): New mean is ; the original rowers need each ( total).
Line 2 (Split Surplus Across 2): (20s).
Line 2 (Split Surplus Across 2): (20s).
Where Students Lose Time: In 9 past UAT-UK questions (4% of Mathematics 1), candidates lose 95s by ignoring sample size weights when combining subgroup means. Instead, apply M6 with Maths 1 skill M6.5.
Step 1 of 6 • Press
ArrowRight or Space